Tissa (Google)
Mar 4, 2026 - Apr 17, 2026
3
Decisions
0
Active Todos
3
Patterns
Categories
Decisions (3)
Committed CVE categorization + kpatch estimates to Google by Monday
After Tissa agreed no one can answer Madhus blanket questions, committed CIQ to deliver a CVE-type classification table with kpatch coverage estimates by Monday. Reshaping an unanswerable request into a structured, defensible answer by category.
FIPS 6.18 Option 2 Engineering Kickoff
After Manu at Google did not respond to the relationship reset email sent Sunday, Peter escalated the FIPS proposal to Tissa via Kelly. Tissa authorized CIQ to proceed. Peter then directed Nathan to begin engineering work on Option 2 (faster timing path) while awaiting the Atsec contract. Engineering was held in reserve until external confirmations landed to avoid thrashing.
Unified Google Proposal — Present Combined GDC/GCE to Rohan
Aligned Kelly and Bjorn on presenting a unified GDC/GCE proposal to Rohan (Google senior director) instead of negotiating separately. Reframing from pro-serve/ticket model to value-driven partnership with a large fixed annual fee ($8-9M).
Related Patterns (3)
Executive Sponsorship for Strategic Partnerships
Strategic cross-company initiatives and major client partnerships require executive-level accountability to move at the right pace and ensure proper prioritization.
Small Circle for Sensitive Operations
When executing sensitive strategic operations, keep the circle of informed people as small as possible to prevent leaks that could accelerate hostile action or undermine the initiative.
Protect Engineering Capacity
When external demands threaten to overload engineering capacity, protect capacity by either requiring the demand to come with additional resources, or forcing hard prioritization choices upstream.