Alex Trafton
Aug 19, 2026 - Aug 24, 2026
2
Decisions
0
Active Todos
5
Patterns
Categories
Decisions (2)
Call the Core42 SOW1 won mid-call and forbid reopening anything that does not need reopening
During the Aug 24 Core42 and CIQ call, the customer side kept probing why the SOW does not cover the broader logical control set, and the CIQ team started engaging on where work splits under partials. Peter intervened twice in four minutes in the internal channel running alongside the call. First he reframed the confusion: I think we have lost track of the fact that ultimately there will be 2 SOWs. Then, once Alex Trafton had asked whether they could sign, he closed it: this is won, we should be careful not to re-open ANYTHING that does not need to be reopened. When Adam Jackson asked whether he could stop screen-sharing the HLD, Peter answered yes please stop sharing. The team changed behaviour inside the same minute - Bjorn said I will wrap, Brian Dawson said he would refrain from additional comment and let Bjorn and Adam land it, and Adam stopped sharing. The SOW1 final package went out to Core42 by email that afternoon.
Fork the Core42 engagement into two SOWs and let nothing delay the first - land the GB300 paper now, put the expanded security architecture in a separate SOW
On the Aug 19 CIQ-C42 Gap Analysis Part 2 call, Alex Trafton (Core42 CISO, roughly 10 weeks into the role) opened a scope far wider than the existing SOW - PAM consolidation across 4-plus tools, continuous vulnerability management, AI-specific security, physical and OT telemetry correlation, and future AMD MI350X deployments. The room read it as a much larger opportunity. Peter, facilitating, held the immediate GB300 deployment SOW as a closeable unit on its own and pushed the expanded scope into a separate second SOW. In the debrief immediately after the call he put it to Adam Jackson directly: But you agree, Adam, that for the next couple of days, it is just about getting that first SOW across. Adam: Yeah, 100 percent, Peter, 100 percent. Peter: I just do not want to put anything in the way of that. The same instinct had been set the night before in the pre-call, where the agreed play was to propose a second SOW or a simple addendum rather than expand the current paper.
Related Patterns (5)
Executive Sponsorship for Strategic Partnerships
Strategic cross-company initiatives and major client partnerships require executive-level accountability to move at the right pace and ensure proper prioritization.
Small Circle for Sensitive Operations
When executing sensitive strategic operations, keep the circle of informed people as small as possible to prevent leaks that could accelerate hostile action or undermine the initiative.
Protect Engineering Capacity
When external demands threaten to overload engineering capacity, protect capacity by either requiring the demand to come with additional resources, or forcing hard prioritization choices upstream.
Reclassify to Route - Decide Who Owns It, Then Give a Criterion Not a Verdict
When a question arrives at Peter framed in one domain, he often does not answer it in that framing. He reclassifies it into the domain that actually governs the outcome, which relocates ownership to whoever owns that lane, and then hands down a decision criterion rather than a verdict. The reclassification IS the decision - it determines who decides. He does this rather than adjudicating on the merits himself, even when he was explicitly cc-ed and even when a direct report challenges him on the substance.
Route Non-Differentiating FTE Classes to Partners
When CIQ would otherwise need to staff a function whose work does not differentiate the company — compliance bureaucracy, audit/cert paperwork, ongoing regulatory attestation, etc. — Peter routes the load to a partner who already owns adjacent capability rather than adding the FTE class internally. Org-shape decision dressed as a partnership decision.