Situation
Codified explicitly in Justin 1:1 5/21 and same-day endorsed via Chris W DM: Jiras confidence number is a communication contract between engineering and GTM. Rules: (1) drop confidence immediately when a date is at risk (e.g., 80%→50%), (2) slide the date by a calculated intentional amount, (3) once confidence is high (95%), the date is a firm commit and must be hit even at extra cost, (4) treat ALL work as change-requests (no bug-vs-scope debate), (5) any change in understanding triggers immediate date/confidence updates. Engineering Order of Operations vs JPD prioritization formally separated: engineering owns operational/health priority (e.g., image build pipeline rework), JPD = product-value priority. Significant misalignment triggers a conversation. Same doctrine to be rolled out to Nathan and Max next.
Reasoning
Multi-layer structural completion of the bug-vs-scope reframe started 5/19. The 5/19 Brady reframe (no bugs, only change requests) was the language piece — it removed the bug category but did not create enforcement surface. The 5/21 doctrine is the mechanism piece — confidence numbers give the language real-world teeth: dates that do not move must be backed by confidence updates as risk emerges, and 95% must be hit. Together they are the structural fix to the date-changes-happening-AFTER-deadlines pattern (4/14 → 5/12 → continued post-5/19 with multiple directs pushing dates after missing them). The accountability shifts from did you hit the date to did you flag the risk in time. Chris W applying the doctrine the same day (V4 +7d slip at 98% confidence) is the smoking gun the doctrine lands. Rolling it to Nathan and Max completes the cascade — when all four directs use the same language and mechanism, GTM finally has one source of truth and the Chris-Baek micromanagement ask (engineer-level tickets) becomes unnecessary.
Additional Context
Same week as the Brian Dawson 5/21 8am GTM-side reframe: consolidate/rename product priority tickets, ~130 items → ~50-55 value-driven initiatives over next 3-4 months. Engineering doctrine + product board cleanup landed in the same week intentionally — the two sides of one reframe. Mid-year review timing also relevant: directs are in reflective-receptive mode when the doctrine gets taught.
Observed Evidence
Justin 1:1 transcript-level coaching of the protocol. Chris W same-day application + Peter explicit endorsement in DM. Action item for Peter to schedule walkthrough with Nathan/Max. Engineering Order of Operations formalized as separate from JPD.
Matching Patterns
Confidence Breakdown
Reasoning Depth Analysis
People Involved
Source
reflection
AI Confidence
84%
Related Context
fathom
Function: communication contract that must reflect reality. Drop confidence immediately when at risk. Slide date intentionally. 95% = firm commit, must hit even at extra effort. Treat all work as change-requests.
slack
Awesome. Ive run teams that way for years and have never once missed that new date. Theyll hit it.
fathom
Chris will update timelines and communicate the new, confident date to Lindsay. V4 +2 weeks at 98% confidence.
Outcome
No outcome recorded yet.