Escalated Engineering Estimation Accountability — 58% Miss Rate
Situation
Identified that 58% of engineering estimates are being missed, with most date changes occurring after the target date. Declared this unacceptable and directed Brady to present this data at the next Engineering Weekly (Apr 14). Peter committed to personally attending to ensure accountability and a clear plan to fix the process.
Reasoning
The 58% miss rate is a systemic engineering credibility problem — if engineering can't commit to dates, the entire prod/eng interface breaks down. Most changes happening after the target date means engineering isn't flagging risks early — they're silently missing deadlines and adjusting after the fact. Having Brady (Product) present the data is deliberate — it makes engineering confront the impact on people waiting for deliverables. Peter's personal attendance signals CTO-level weight behind accountability.
Additional Context
The specific trigger was Brady's data analysis of engineering delivery accuracy across the product board. This connects directly to the prod/eng exit criteria decision — estimation accuracy is the engineering side of the interface contract. The TPS report corroborates with multiple items showing date slips and overdue warnings.
Observed Evidence
Fathom meeting summary captures the estimation miss rate discussion and the directive for Brady to present at Engineering Weekly. Peter committed to attending personally. TPS report corroborates with multiple items showing date slips across Core Distro and Release All Things.
Matching Patterns
Confidence Breakdown
Reasoning Depth Analysis
Related Context
fathom
58% of engineering estimates are missed, with most changes occurring after the target date. Brady will present this data in the next Engineering Weekly. Peter will attend to ensure accountability.
Outcome
No outcome recorded yet.